Case study
Home charging, planned around the driveway.
A domestic EV charger positioned for everyday use, with the cable route and supply checked first.


The problem
The driver wanted a charger beside the driveway without an awkward cable route across the main entrance. Choosing a unit was only part of the job: the existing supply, mounting position and installation route also needed assessment.
What we did
The scope includes the supply assessment, a specified home charger, the agreed cable route and protective equipment. Relevant permissions or network requirements are checked before installation. Commissioning is followed by a demonstration of the charging controls.
The result
The result is a neatly positioned home charger with a practical place for the cable. No grant, charging speed or electricity-saving figure is assumed without the relevant checks.
The position and cable route were agreed before anything was fitted. It made the choice straightforward.
Got a similar job?
Get a price range in 60 seconds, then book a free survey.